Golden Oil Refinery — VDU

Golden Oil Refinery — VDU: Structural design of the process-unit steel structures. Structural calculations and detailed drawings for storage-tank foundations.

CLIENT
SPEC EPC
LOCATION
Najaf, Iraq
YEAR
2020
Golden Oil Refinery — VDU
01 / ENGINEERING FOCUS

Engineering behind the structure.

Process-unit steel structures and tank foundations form separate work packages. Key interfaces include steelwork and equipment, alongside foundation plans, sections and reinforcement details for the tanks.

02 / SCOPE

Scope of work.

Structural design of the process-unit steel structures. Structural calculations and detailed drawings for storage-tank foundations.