Al-Watanya Biturox Unit
For the Al-Watanya Biturox Unit, STARK’s scope includes the design of tank, equipment, building, package unit, steel structure and pipe rack foundations. Civil engineering also covers tank site and underground drainage systems, the X671 API separator and the X672 oily water sewer pit. Steel structure work comprises the main and utilities pipe racks, offsite and tank site sleepers / pipe racks, and the loading area canopy.
- CLIENT
- EMC MAKİNA A.Ş
- LOCATION
- Iraq
- YEAR
- 2016

Engineering behind the structure.
Foundation and drainage design for the process unit, together with pipe support systems and loading area steel structures.
Scope of work.
CIVIL ENGINEERING Tank foundations Tank site drainage system Steel structure foundations Main pipe rack foundations Utilities pipe rack foundations Offsite sleeper / pipe rack foundations Tank site sleeper / pipe rack foundations Equipment foundations Underground drainage system Building foundations Package unit foundations X671 API separator civil design X672 oily water sewer pit civil design STEEL STRUCTURES Main pipe rack Utilities pipe rack Offsite sleeper / pipe rack Tank site sleeper / pipe rack Loading area canopy
Site and design views.
Select an image to view it at full size.


